Where the money goes

Projects, school by school.

Measure G-26 focuses on grades 9–12. Estimates are based on today's construction market from the district's 2030 Vision Facilities Master Plan, for a total of about $202 million in needs. The images below show each campus today and concept designs for the future.

Concept rendering of the War Memorial practice gym

Site 1

Paso Robles High School

$162,536,500

Academics

  • • Build adaptable CTE and vocational classrooms
  • • Renovate existing classrooms
  • • Create a new library and common study area

Athletics

  • • Build a new gymnasium and related facilities
  • • Improve athletic fields, including new turf
  • • Replace or refurbish restrooms and locker rooms

Campus

  • • Build a new cafeteria and food service facility with culinary (CTE) classrooms
  • • Build specialized learning spaces for students with disabilities
  • • Improve parking, sidewalks and walkways
Home of the Bearcats building at Paso Robles HighNow
Paso Robles High administration entranceNow
Paso Robles High School sign from the streetNow
Paso Robles High today
Indoor eating after Measure G-26 (concept)New space · Future
Indoor eating

New for students — the campus does not have this space today.

Campus quad todayNow
Campus quad after Measure G-26 (concept)Future
Campus quad
Advanced manufacturing after Measure G-26 (concept)New space · Future
Advanced manufacturing

New for students — the campus does not offer this pathway today.

Technology lab after Measure G-26 (concept)New space · Future
Technology lab

New for students — the campus does not offer this pathway today.

Healthcare pathway todayNow
Healthcare pathway after Measure G-26 (concept)Future
Healthcare pathway
Culinary arts todayNow
Culinary arts after Measure G-26 (concept)Future
Culinary arts
Gym to event center todayNow
Gym to event center after Measure G-26 (concept)Future
Gym to event center

Site 2

Liberty & Independence High

$27,050,000

Career Tech

  • • Build career technical and vocational classrooms that adapt to industry demand

Classrooms

  • • Build new classrooms for Independence High School
  • • Expand the footprint of Liberty High School

Restrooms

  • • Renovate restrooms with fully accessible facilities
Future career tech classroomFuture
Hands-on healthcare trainingFuture
Flight simulator trainingFuture
Drone training programFuture

Future learning spaces and career training

Site 3

War Memorial & Independent Skills Program

$12,670,000

Access

  • • Increase and improve parking with accessible pathways
  • • Build a new stadium drop-off and pickup area
  • • Renovate or replace bleachers and add accessible seating

Athletics

  • • Improve the athletic field, including synthetic turf
  • • Build new team training facilities

Facilities

  • • Build a shaded outdoor learning area
  • • Refurbish restrooms with accessible facilities
  • • Build new concession areas
War Memorial Stadium todayNow
War Memorial Stadium after Measure G-26 (concept)Future
War Memorial Stadium
Team facilities todayNow
Team facilities after Measure G-26 (concept)Future
Team facilities
Independent Skills Program todayNow
Independent Skills Program after Measure G-26 (concept)Future
Independent Skills Program

Future images are concept designs from the district's presentation and may change as projects are designed.

In the resolution

The official project list.

  1. 01Career/vocational classrooms that adapt to industry demand
  2. 02Renovate existing classrooms
  3. 03New cafeteria and food service
  4. 04Replace or refurbish restrooms, locker rooms and athletic facilities
  5. 05Renovate and expand the library
  6. 06Remove outdated buildings
  7. 07Improve the athletic field, including new turf
  8. 08New gymnasium
  9. 09Better parking, sidewalks and walkways
  10. 10Classrooms and support spaces for students with disabilities

Source: Resolution project list, “Bond Measure — Prospective Projects.”

$157,285,000

Paso Robles High in detail.

The high school is $157.3 million of the $192.5 million estimate. Codes match the numbers on the master plan (N = new, M = modernized).

PRHS master plan, floor 1
PRHS master plan, floor 1 · Concept plan from district documents
PRHS master plan, floor 2
PRHS master plan, floor 2 · Concept plan from district documents

Classrooms & career training

  • N11New two-story, 18-classroom building (incl. 2 CTE rooms with band and 1 therapeutic learning room)
  • N7Health science CTE classrooms upstairs in the new event center
  • M2Modernized administration, student services and attendance, with a new entry gate

Food, library & commons

  • N9New two-story student commons replacing the 700 building: cafeteria, kitchen and culinary below; digital library and CTE digital classroom above
  • N10New outdoor eating area
  • N12Building 400 replaced with modernized courtyards

Athletics & fields

  • N7New 2,200-seat event center and gym with locker rooms, wrestling, dance and concessions
  • N6New turf, lights and scoreboard
  • N2New tennis courts and shaded bleachers
  • N13Two pickleball and two basketball hardcourts
  • N5Expanded football storage
  • N4New restrooms

Special learning spaces

  • M4Two therapeutic learning center classrooms

Site, parking & agriculture

  • N3New parking lot
  • N8New parking lot and perimeter fencing
  • N1New animal barn, pens and fencing
  • M1Renovated animal barn, pens and fencing
  • M3Kiosk removed

Source: PRHS potential projects and master plan, “Bond Measure — Prospective Projects.”

$22,590,000

War Memorial & Independent Skills.

War Memorial master plan
War Memorial master plan · Concept plan from district documents
  • N1Parking, shaded outdoor space and half court for the Independent Skills Program
  • N2New bleachers, press box, PA system and resurfaced field
  • N3New practice gym with team rooms, concessions and weight training
  • N4Two shaded basketball hardcourts
  • N5New path to the field
  • N6New stadium drop-off
  • N7Processional path to the field; playground returned to the district
  • N8Concession grounds
  • N9ADA parking and access; maintenance building replaced
  • M1Old concessions turned into maintenance space

Source: War Memorial master plan, “Bond Measure — Prospective Projects.”

$12,670,000

Independence & Liberty.

Liberty (continuation high school) and Independence (alternative education) share the Niblick Road campus next to Paso Robles High and the district office.

Independence and Liberty master plan
Independence and Liberty master plan · Concept plan from district documents
  • N1New administration and six-classroom building with a patio to the district office
  • R1Modernized Liberty High School
  • R2Secure restroom access for the fields

Source: Independence/Liberty master plan, “Bond Measure — Prospective Projects.”

Election Day · November 3, 2026

Vote yes on G-26